User menu

Sequencing a hybrid two-stage flowshop with dedicated machines

Bibliographic reference Fouad, Riane ; Elmaghraby, Salah Eddine ; Artiba, Abdelhakim. Sequencing a hybrid two-stage flowshop with dedicated machines. In: International Journal of Production Research, Vol. 40, no. 17, p. 4353-4380 (2002)
Permanent URL http://hdl.handle.net/2078/20204
  1. ARTIBA A., A rule-based planning system for parallel multiproduct manufacturing lines, 10.1080/09537289408919506
  2. Artiba Abdelhakim, Riane Fouad, An application of a planning and scheduling multi-model approach in the chemical industry, 10.1016/s0166-3615(98)00073-6
  3. BIAZIWICZ J., Scheduling Computer and Manufacturing Process (1996)
  4. BOTTA-GENOULAZ V., Planification et ordonnancement d'une succession d'ateliers avec contraintes (1996)
  5. Brah Shaukat A., Hunsucker John L., Branch and bound algorithm for the flow shop with multiple processors, 10.1016/0377-2217(91)90148-o
  6. BUTEN, R. E. and SHEN, V. Y. A scheduling model for computer systems with two multiprocessors. Proceedings of the Sagomore Computer Conference on Parallel Processing. pp.130–138.
  7. Campbell Herbert G., Dudek Richard A., Smith Milton L., A Heuristic Algorithm for thenJob,mMachine Sequencing Problem, 10.1287/mnsc.16.10.b630
  8. ELMAGHRABY S. E., Sequencing jobs on two-stage hybrid flowshop with identical machines to minimize makespan (1998)
  9. Garey M. R., Johnson D. S., Sethi Ravi, The Complexity of Flowshop and Jobshop Scheduling, 10.1287/moor.1.2.117
  10. Gupta J. N. D., A flowshop scheduling problem with two operations per job, 10.1080/002075497194868
  11. HE DAVID W., KUSIAK ANDREW, ARTIBA A., A scheduling problem in glass manufacturing, 10.1080/07408179608966258
  12. HERRMANN J. W., Three-machine look-ahead scheduling problems (1992)
  13. Johnson S. M., Optimal two- and three-stage production schedules with setup times included, 10.1002/nav.3800010110
  14. Lee Chung-Yee, Vairaktarakis George L., Minimizing makespan in hybrid flowshops, 10.1016/0167-6377(94)90026-4
  15. QI MEI, Scheduling two-stage production lines with multiple machines, 10.1080/09537289608930370
  16. NARASTMHAN SEETUARMA L., PANWALKAR SHRTKANT S., Scheduling in a two-stage manufacturing process, 10.1080/00207548408942479
  17. Paul R. J., A Production Scheduling Problem in the Glass-Container Industry, 10.1287/opre.27.2.290
  18. RIANE F., Scheduling hybrid flowshops: algorithms and applications (1998)
  19. RIANI, F. and ARTIBA, A. Scheduling multi-stage flowshop problem: stale of the art. International Conference on Industrial Engineering and Production Management. H. pp.323–335.
  20. RIANI, F., ARHBA, A. and ELMAGHRABY, S. E. Sequencing on hybrid fluwshop to minimize makespan. Proceedings of the First International Conference on Operations and Quantitative Management. Jaipur, II. pp.572–579.
  21. Salvador Michael S., A Solution to a Special Class of Flow Shop Scheduling Problems, Lecture Notes in Economics and Mathematical Systems (1973) ISBN:9783540064374 p.83-91, 10.1007/978-3-642-80784-8_7
  22. SHUN, V. Y. and CHUN, Y. E. A scheduling strategy for the flowshop problem in a system with two classes of processors. Proceedings of the Conference on Information und System Science. pp.645–649.
  23. Vignier A., Billaut J.-C., Proust C., Les problèmes d'ordonnancement de type flow-shop hybride : état de l'art, 10.1051/ro:1999108
  24. Wittrock Robert J., An Adaptable Scheduling Algorithm for Flexible Flow Lines, 10.1287/opre.36.3.445